Name of Authority | Description of Work |
GrameenPhone Ltd. | Site Survey & Acquisition Works.
Civil Works Maintenance at BTS Sites. Tower Foundation Works. Design, Supply, Transportation & Erection of Telecom Tower & Related Services. BTS Installation, MW Link & Commissioning |
Robi Axiata Limited, | Tower Foundation Works.
Design, Supply, Transportation & Erection of Telecom Tower. Installation of BTS & MW Link |
Bangladesh Telegraph & Telephone Board (BTTB) | Construction of BTS Room (Roof Top & Green Field) Works.
Tower Foundation Works. Supply & Installation PU Cabin. Design, Drawing, Site Supervision, Fabrication, Supply, Installation, Transportation & Erection of Self Supported Tower |
Teletalk Bangladesh Ltd. | Site Survey, Site Acquisition Works
Design, Drawing & Construction of BTS Room (Roof Top & Green Field) Works. Supply & Installation PU Cabin. Tower Foundation Works. Design, Drawing, Site Supervision, Fabrication, Supply, Installation, Transportation & Erection of Tower. Indoor Electrical Works Commercial Power Connection. Earthing System Supply & Installation of MDB, SPD & Fire Detection System Supply & Installation of Station Power System (Battery & Rectifier). Planning, Design, Survey, Installation & Commissioning and Testing of Transmission Links (Microwave Links). BTS Installation, Commissioning, Dismantle, Relocation, Installation & Commissioning Works. Supply of Telecom Accessories (Feeder Cable, Feeder Connector, RF Connector, Jumper Cable, Grounding Kit, Feeder Clamp & Power Cable). Installation of Air Condition System |
Pacific Bangladesh Telecom Ltd (City Cell) | Design, Supply, Transportation & Erection of Telecom Tower. |
Banglalink Digital Communications Ltd | Supply of Telecom Tower with Side Arms. |
Airtel / Warid Telecom International Ltd. | Design, Drawing & Construction of BTS Room (Roof Top & Green Field) Works.
Tower Foundation Works. Design, Drawing, Site Supervision, Fabrication, Supply, Installation, Transportation & Erection of Tower. Supply & Installation of VRLA Battery including necessary Installation Materials |
Banglalion Communications Ltd. | Design, Drawing, Site Supervision, Fabrication, Supply, Installation, Transportation & Erection of Tower |
China Machinery Engineering Corporation (CMEC) | Survey, Structural Design, Civil Construction of BTS Room and Abloy Plate Installation Under the project titled “Introduction of 3G Technology and Expansion of 2.5G Network” |
Huawei Technologies (Bangladesh) Co., Ltd. | Design, Drawing, Site Supervision, Fabrication, Supply, Installation, Transportation & Erection of Tower.
Supply & Installation PU Cabin |
Motorola Bangladesh Ltd | Tower Foundation.
Design, Drawing, Site Supervision, Fabrication, Supply, Installation, Transportation & Erection of Tower. |
Nokia Bangladesh Ltd | Tower Foundation.
Design, Drawing, Site Supervision, Fabrication, Supply, Installation, Transportation & Erection of Tower. |
SIEMENS Bangladesh Ltd. | Design, Drawing & Construction of BTS Room (Roof Top & Green Field) Works.
Tower Foundation Works. Supply & Installation PU Cabin. Design, Drawing, Site Supervision, Fabrication, Supply, Installation, Transportation & Erection of Tower |
Nokia Siemens Network | BTS Installation and MW Link & Commissioning |
LM Ericsson Bangladesh Ltd | Tower Foundation Works
Design, Drawing & Construction of BTS Room (Roof Top & Green Field) Works. Supply & Installation PU Cabin RBS and MW Installation & Commissioning GSM & Feeder Cable Installation & Testing VSWR. |
Construction Sector
Name of Authority | Description of Work |
Roads & Highways Department | Plantation at Median of Dhaka-Chittagong Highway (Mainamati to Batisha) under 4-Lanning of Dhaka-Chittagong Highway Project, Package No. WP2
Plantation at Median of Dhaka-Chittagong Highway (Batisha to Dhumghat) under 4-Lanning of Dhaka-Chittagong Highway Project, Package No. WP3 Construction of 2 nos of Toll Booth including New jersey Barrire & By-lane providing H.B.B Work at 25th KM (Megna Toll Plaza area) of Dhaka (Jatrabari) – Comilla (Mainamati) – Chittagong – Teknaf National Highway Road (N-1) Under Narayangonj Road Division during the year 2017-2018 Construction of 2 nos of Toll Booth including New jersey Barrire & By-lane providing H.B.B Work at 42nd KM (Gumoti Toll Plaza Area) of Dhaka (Jatrabari) – Comilla (Mainamati) – Chittagong – Teknaf National Highway Road (N-1) Under Narayangonj Road Division during the year 2017-2018 Steel Light Post including fitting fixing and placing for improvement of Blackspot (Hemayetpur Intersection) Portion at 7th km of Dhaka-Aricha-National Highway Road (N-5) Under Dhaka Road Division during the Year 2017-2018 |
Comilla Cantonment | Construction of Underpass Ramp and Tunnel across to DHK-CTG Highways, Service Road, footpath with drain, link road of GE (army) to northern part, shahid mostafa kamal gate, MP check post & residence, beautification with gardening at Comilla Cantonment.
Construction of Service Road & Footpath with Utility Shifting for 4-Lane Dhaka-Chittagong Highway Road Project at Comilla Cantonment. |
Sinohydro Corporation Ltd | Design, Supply, Erection, Fitting & Foundation work of Pre-Fabricated Overhead Pedestrian Bridge for 4-Lanning of Dhaka-Chittagong Highway Project.
Design, Supply, Erection, Fitting & Foundation work of Pre-Fabricated Passenger Shelter for 4-Lanning of Dhaka-Chittagong Highway Project. Design, Supply, Erection, Fitting & Foundation work of Pre-Fabricated Gantry Road Signs for 4-Lanning of Dhaka-Chittagong Highway Project. Concrete Pavement (PQC & DLC) for 4-Lanning of Dhaka-Chittagong Highway Project. |
Sepctra Engineers Limited (Reza Construction Ltd.) | Design, Supply, Erection, Fitting & Foundation work of Pre-Fabricated Overhead Pedestrian Bridge for 4-Lanning of Dhaka-Chittagong Highway Project.
Design, Supply, Erection, Fitting & Foundation work of Pre-Fabricated Passenger Shelter for 4-Lanning of Dhaka-Chittagong Highway Project. Design, Supply, Erection, Fitting & Foundation work of Pre-Fabricated Gantry Road Signs for 4-Lanning of Dhaka-Chittagong Highway Project. |
Rana Builders Ltd. | Design, Supply, Erection, Fitting & Foundation work of Pre-Fabricated Overhead Pedestrian Bridge for 4-Lanning of Dhaka-Chittagong Highway Project. |
Taher Brothers Ltd. | Design, Supply, Erection, Fitting & Foundation work of Pre-Fabricated Passenger Shelter for 4-Lanning of Dhaka-Chittagong Highway Project.
Design, Supply, Erection, Fitting & Foundation work of Pre-Fabricated Gantry Road Signs for 4-Lanning of Dhaka-Chittagong Highway Project. |
Gannon Dunkerley & Co. Ltd. | Rehabilitation of Existing Bridge of Lemua, Mohuri and Dhumghat after demolishing of existing deck slabs of Lemua and Mahuri (one span each) and fixing of Expansion Joints to all three existing bridge |
Italian – Thai Development Public Company Limited | Execution of Canteen Shed at Agargaon: Earth excavation works, sand filling after Construction, sand filling bottom of footing, Cement Concrete, RCC, Deformed bar, Prefabricated, C section, Rafter C Section, Brick wall, RCC Work, Reinforcement (Rebar Work) Roof Metal Sheet with Steel Trowel Finish, Plaster Work, paint Work, Celling Work (Partex Bord, Gypsum Board, MS Furring, Channel), Window Aluminum Framing and Glass and MEP Work, transportation with loading and unloading. |
ITD-Sinohydro JV | Retaining Wall Construction at Depot, Uttara for Dhaka Mass Rapid Transit Development Project. |
JON JV | Construction, Supply & Installation of Canopied Toll Booth at Charsindur Bridge. |
Bangladesh Specilized Hospital Ltd. | Design, Supply, Transportation & Erection of 10 storied HVAC (OD) Structure, 10 storied link floor (with 2 nos passenger lift), Roof Top chiller steel raise floor, Roof Top 02 storied prefabricated building, Ground floor linkage structure and floor covered by steel joist & decking |
Name of Authority | Description of Work |
Bangladesh Specialized Hospital Ltd. | 3 Basement + 14 Storied at Shyamoli, Dhaka. |
Bangladesh Eye Hospital | 7 Storied at Uttara, Dhaka |
Constech Jasmine | 7 Storied at Adabor, Dhaka |
Flashing Meadow | 6 Storied at Pallabi, Mirpur, Dhaka. |
Udoyan | 6 Storied at Adabor, Dhaka. |
Uttaran | 6 Storied at Adabor, Dhaka. |
Sunshine | 6 Storied at South Badda, Gulshan-01, Dhaka. |
Simplicity | 6 Storied at Pallabi, Mirpur, Dhaka |
Malancha | 6 Storied at Mohammadpur, Dhaka. |
Client | Description of Work |
German Bangla Bicycles Ltd. | Installation of Steel Building at Different Location at Bangladesh such as Banani, Mirpur, Demra, Gulshan-2, Dhamrai, Dhaka, Munshigonj, Sylhet, Rangpur, Mymensingh, Narayangonj, Gazipur, Savar, Rajendrapur, Bogra & Pabna.
Approx. Qty 951000 sft |
Rangpur Dairy & Food Products Ltd. | |
Europa Group | |
Tsco Power Ltd. | |
RAK Ceramics (BD) Ltd. | |
S. Q Wire Ltd. | |
Superior Builders & Engineers Ltd | |
Knit Asia Ltd | |
MAM Power Ltd. | |
UCEP-Bangladesh | |
Marble Di Carrare (Pvt.) Ltd. | |
Doreen Tower (Pent House) | |
Bengel Electric Ltd. | |
Adak Marketing (BD) Ltd | |
Supersign Cables Ltd | |
Thikana Fashion Ltd | |
Embro Fashion Ltd | |
Quality Feed Ltd | |
Super Agro Feed Ltd | |
Energy Plus CNG Station | |
Fahim Marble Ltd | |
Alif Group | |
Patowary Potato Flacks Ltd | |
Mosque | |
Singer Group | |
APEX Holdings Ltd. (Factory Building) | |
Scandex Textiles Ltd. Dyeing & Knitting Unit | |
Scandex Knitwear Ltd. Knit Wear Unit | |
Scandex Knitwear Ltd. Knit Wear Unit | |
Dana Group (Office Building) | |
Noman Group | |
Bangla Meet (Meat Processing Plant) |