Roads & Highway
Plantation at Median of Dhaka-Chittagong Highway (Mainamati to Batisha) under 4-Lanning of Dhaka-Chittagong Highway Project, Package No. WP2
Plantation at Median of Dhaka-Chittagong Highway (Batisha to Dhumghat) under 4-Lanning of Dhaka-Chittagong Highway Project, Package No. WP3
Construction of 2 nos of Toll Booth including New jersey Barrire & By-lane providing H.B.B Work at 25th KM (Megna Toll Plaza area) of Dhaka (Jatrabari) – Comilla (Mainamati) – Chittagong – Teknaf National Highway Road (N-1) Under Narayangonj Road Division during the year 2017-2018 (TID 113280)
Construction of 2 nos of Toll Booth including New jersey Barrire & By-lane providing H.B.B Work at 42nd KM (Gumoti Toll Plaza Area) of Dhaka (Jatrabari) – Comilla (Mainamati) – Chittagong – Teknaf National Highway Road (N-1) Under Narayangonj Road Division during the year 2017-2018
Construction of Connection Road by HBB & Overhead Steel Gantry for Road Sign work at 25th KM (Megna Toll Plaza area) of Dhaka (Jatrabari) – Comilla (Mainamati) – Chittagong – Teknaf National Highway Road (N-1) Under Narayangonj Road Division during the year 2017-2018
Steel Light Post including fitting fixing and placing for improvement of Blackspot (Hemayetpur Intersection) Portion at 7th km of Dhaka-Aricha-National Highway Road (N-5) Under Dhaka Road Division during the Year 2017-2018 (TID 209049)
Supply, Fitting and Fixing of Electric GI Pole, LED Street Light with necessary wiring cable on 2nd Buriganga Bridge (Babu Bazar Bridge) at 1st km of 2nd Buriganga Bridge Link Road Connected to National Highway N8 (N-802) Road under Dhaka Road Division, Dhaka, during the year 2018-2019. (Ch: 0+000 to 1+400) (TID 241353)
Construction of Footover Bridge at Savar Bazar (Ch. 14+050) of Dhaka (Mirpur)-Utholi-Paturia-Bangladandh Road (N-5) under Dhaka Road Division During the Year of 2017-2018 (TID 185395)
Construction of Footover Bridge at Joy Bangla Gate (Gh. 17+900) of Dhaka (Mirpur)-Utholi-Paturia-Bangladandh Road (N-5) under Dhaka Road Division During the Year of 2017-2018 (TID185400)
Construction of RCC Drain with slab at 1st km(P), 2nd km & 3rd km (p) (L/S) of Nabinagar-DEPZ-Kaliakoir-Chandra road under Road Division Manikganj during the year 2017-2018 (TID 195168)
Supply Erecting & Assembling of Steel Truss & Bailey Bridge Components at 5thp km of Bhurungamari-Sonahat Landport-Mothergonj-Bhitorbond-Nageshweri Road Z-5624 under Road Division Kurigram during the year 2018-2019.
Repair renovation and re-construction work with tiles sanitary painting electrical false ceiling interior decoration sliding door work of RHD Dhaka zone office building 2nd floor at Elenbari under Dhaka Road Division during the year 2018- 2019.
Providing & Installation of Road Overhead Gantry Sign at 38th (p) km & 50th (p) km of Rangpur-Borobari-kurigram N-506 Road under Road Division Kurigram during the year 2018-2019
Construction of 2 nos of Toll Booth including RCC Barrire By-lane providing RCC & H.B.B Work at 20th KM Kanchan Toll Plaza area & DBS Wearing Course work at 15thP 16thP 20thP 21stP & 22ndP Km of Madanpur13th Km of N1-Joydevpur3rd Km of N4 N-105 Road under Narayangonj Road Division during the 2018-2019 PMP ROAD 2018-2019. (TID324527)
Installation of Street Light Including fitting & fixing from Savar to Nabinagar Ch. 15+000 to Ch. 21+740 of Dhaka-Aricha National Highway N-5 under Dhaka Road Division during the year 2018-2019 (TID328082)
Improvement of Road Safety by Installation of Street Light point and other safety features at different Bus stands on Nabinagar Chndra Road N-540 and Nabinagar Intersection of Dhaka-Aricha Road N-5 under Manikganj Road Division during the year 2018-2019 (TID300486)
Construction Supply & Installation of Tulshikhali Toll Plaza at 16th km of Zinzira-Keraniganj-Nawabganj-Dohar-Sreenagar Road R-820 under Munshiganj Road Division during the year 2018-2019 (TID317502)
Construction of 1 One Nos Footover Bridge Ch3100 and 1 One Nos Underpass Ch 2900 at Baipail Intersection of Nabinagar Chandra Road N-540 Under Manikgonj Road Division during the year of 2018-2019 (TID273482)
Construction of Machine Room including supply and installation of Lift for RHD Dhaka Zone Office Building at Alenbari, Dhaka under Dhaka Road Division during the year 2019-2020 (TID378277)
Repairing & renewing the Office Complex remodeling work including loby decoration at Allenbari RHD Office Building under Dhaka Road Division during the year 2019-2020 (TID401703).
Emergency supply of medium back ergonomic chair and low back PU chair of RHD Dhaka zone office conference room at Allenbari, Dhaka under dhaka road division during the year 2018-2019.
Carrying, Launching & De-launching of 56 m bailey bridge (Hazratpur bridge) With repair approach at15th KM of Keranigonj (Konakhola)-Kholamora-Hazratpur- Itabara -Hemayetpur Road (Z-8002) under Dhaka Road Division during the year 2019-2020 (TID401728).
Allenbari office complex outside wall steel screening, steel canopy, aluminium composite pannel and roof damage treatment work under Dhaka Road Division during the year 2019-2020. (TID417481).
Office Building boundary wall, boundary gate, guard room and others relevent work at Allenbari under Dhaka Road Division during the year 2019-2020. (TID417935).
Construction of Guard Rail, Fencing, Road Marking and Road repair work of Salepur bridge area at 2nd km (P) of Dhaka-Aricha National Highways (N-5) under Dhaka Road Division during the year 2019-2020. (TID419736-1)
Maintenance of Plants re-plantation and Ancillary works of different type of Decorative Plants from Ch. 39+267 Daudkandi to Ch. 84+267 Alekhar Char at Road Median of Dhaka-Chittagong 4 Laned National Highway N-1 (Gouripur Road Sub-Divisional Part) under Road Division Comilla during the Year 2017-2018 (TID150810)
Maintenance of Plants re-plantation and Ancillary works of different type of Decorative Plants from Ch. 84+267 Alekhar Char to Ch. 139+000 Mohammad Ali Bazar at Road Median of Dhaka-Chittagong 4 Laned National Highway N-1 (Comilla Road Sub-Divisional Part) under Road Division Comilla during the Year 2017-2018 (TID150772)
Widening strengthening and surfacing work Replacement of Steel Structure on mid span of Existing Bridge 30.488m Construction of PC Girder Bridge including mid span Steel Structure 91.464m of Estema Highway R-303 under Gazipur Road Division during the year 2018-2019 (TID231060)
Construction of 05 (Five) Nos Overhead Pedestrain Bridge (Foot over Bridge) with ancillary works at different location of Dhaka (Banani) Joydevpur -Mymensingh Road (N-3 under Gazipur Road Division during the year 2019-2020 (TID448321)
Repair Work of Executive Engineer’s (Old Office) at Munshiganj under road Division, Musnhiganj during the year 2020-2021 (TID563045)
Construcion of Passenger Waiting Shed at 4th Km. (p) (Aricha Ghat) of Utholi-Aricha National Highway (N-503) under Manikganj Road Division during the year 2019-2020. (TID457510).
Construction of Foot Underpass (south side) (Ch. 2+900) under Baipail Bridge of Nabinagar-EPZ-Kaliakoir (Chandra) Road (N-540) under Manikganj Road Division during the year 2020-2021. (TID 539248).
Construction of 01 (One) Overhead Pedestrian Bridge (Footover Bridge) at 38th km (p) (Hotapara) of Dhaka (Banani)-Joydebpur-Mymensingh Road (N-3) under Gazipur Road Division during the year 2020-2021. (TID 526282).
Construction of Baipail Steel Footwork Overpass at 3rd km (p) (Baipail) of Nabinagar-EPZ-Kaliakoir (Chander) Road (N-540) Road under Manikganj Road Division during the year 2020-2021 (TID536857)
Construction of shed at Inspection Banglow of Nayarhat under Manikganj Road Division during the year 2020-2021 (TID-524198)
Modernisation work of 06 (Six) nos existing footover bridge with New Canopy, retrofitting, Electric light & Paint work at Ch: 0+500, Ch: 1+500, Ch: 2+500, Ch: 3+500, Ch: 5+100 & Ch: 5+600 of Dhaka (Jatrabari) – Cumilla (Mainamati) -Chattogram – Teknaf Road (N-1) National Highway under Narayanganj Road Division during the FY 2020-2021. (TID 542698)
Modernisation work of 03 (Thee) nos existing footover bridge with New Canopy, retrofitting, Electric light & Paint work at Ch: 7+050km, Ch: 7+200 & Ch: 20+450 of Dhaka (Jatrabari) – Cumilla (Mainamati) -Chattogram – Teknaf Road (N-1) National Highway under Narayanganj Road Division during the FY 2020-2021. (TID 542683)
Establishment of a weigh scale at 173rd KM including a control room and Ansar Shed for controlling overloaded vehicles passing through Jashore-Khulna National Highway (N-7) under Road Division, Jashore during the year 2020-2021. (TID 556441).
Carryong, Launching & De-launching of 59 meter Bailey bridge (Hazratpur bridge) at 15th km of K.K.H.I.H Road (Z-8002) under Dhaka Road Division during the year 2020-2021 (TID 558527)
Repair & Renewing boundary wall, boundary gate, Guard Room and others relevant work at RHD office Bhola under Bhola Road Division during the year 2020-2021. (TID 558927)
Construction of 1 No. Footover Bridge at 10th Km (Zirani Bazar Stand) of Nabinagar-EPZKaliakoir (Chandra) Road (N-540) Under Manikganj Road Division manikganj during the year 2020-2021. (TID 517928)
Construction of Main Gate, Guard Room & Boundary wall at Barishal RHD Zone Office under Barishal Road division During the year 2021-2022 (TID 620396)
Construction of Ramp,Toilet, Roof Damage Treatment work at RHD Division office building under Bhola Road Division during the year 2021-2022 (TID 630519)
Facilitation of ACE Office, Barishal RHD Zone Office under Barishal Road Division during the year 2021-2022 (TID 662974)
Construction of RCC U Drain at Ch. 11080m Bata Shoe Gate to 11320m Estema Road 240m of Dhaka Banani-Joydebpur-Mymensing N-3 Road 2 Outfall Drain Tongi Thana Gate to Main Road 282m and Bata Shoe Gate to Turag River 1150m 3 Ch. 0000 Station Road to 0573m Ahsan Ullah Master Flyover Both Side 828m of 4-Lane Part of Tongi-Kaliganj-Ghorashal Road R- 301 under Gazipur Road Division during the year 2020-2021. (TID 537487)
Construction of Boundary Main Gate of Jhalokati Road Division Office under Jhalokati Road Division during the year 2021-2022 (TID 632370)
Repair, Modernisation & Interior decoration of Jhalokati (RHD) Division office Building under Jhalokati Road Division during the year 2021-2022 (TID-613260)
Facilitation work of RHD Office Building at Munshiganj under Munshiganj Road Division during the year 2021-2022 (TID 671480)
Supplying SPLIT Type AIR COOLER & IPS Under Munshiganj Road Division during the year 2021-2022 (TID 681380)
Interior & other related work at 3rd, 4th, 5th, 6th(p), 7th(p), 8th(p), 9th, 10th (p) level of newly built 12-storied) Sarak Bhaban (Part-I) Tejgaon, Dhaka during the year 2020-2021
Faciliation of MIS Server Room & Day Care Center, installation Glass Pyramid & Lift at RHD Head Quarters Complex during the financial year 2021-2022 (606305)
Construction of Toll Plaza including Rigid Pavement with associated site office building and Inspection Bungalow under 8th Bangladesh-China Friendship Bridge Project. (TID 593535)
Construction of Steel Foot over Bridge at 12th Km Madonpur (Ch: 11+985) of Dhaka(Jatrabari) – Cumilla (Mainamati) -Chattogram – Teknaf Road (N-1) under Narayanganj Road Division during the FY 2021-2022. (TID 680218).
Widening of Existing Pavement. Constrction of 2 Nos Foot over Bridge and 1 No 3 Vent culvert cum underpass at 23rd km (p) to 25th km (p) (Ch: 22+800 to 24+800) of Dhaka (Mirpur)-Utholi- Paturia National Highway (N-5) under Manikganj Road Division during the year 2019-2020. (TID 392436).
Construction of Axle load control Station infrastructure including canopy Building & Toll Plaza at Sonahat Bridge approach under the project Construction of Sonahat bridge over the Dudhkumor River at Bhurungamari- Sonahat Landport- Bhitorband- Nageshwari Highway under Road Division, Kurigram during the FY 2021-2022 (TID 644330).
Repairing, Renovation, Interior decoration & Supplying fitting fixing Tiles, Parda, Sanitary fittings, Electric accessories & other Relevent works of Dhaka Circle office including Conference Room at Allenbari, Tejgaon, Dhaka Under Dhaka Road Division during the year 2022-2023 (TID 749574).
Repairing, Renovation, Interior decoration & Supplying fitting fixing Tiles, Parda, Sanitary fittings, Electric accessories & other Relevent works of Dhaka Circle office including Conference Room at Allenbari, Tejgaon, Dhaka Under Dhaka Road Division during the year 2022-2023 (TID 749574)